Concrete Calculator

Concrete volume for slabs, columns and stairs, premixed bags, or cement, sand and gravel.

Your details

Unit system

5–10% is usual; use more on uneven ground or for hand mixing.

%
Concrete supply

Results update as you type

Concrete to order

1.36 cu yd

Net volume (no waste)
1.23 cu yd
In cubic metres
1.038 m³
In cubic yards
1.36 cu yd
Premixed bags needed
62

Bag count for 80 lb bags. Yields are approximate manufacturer figures; check the label of the product you buy.

Step-by-step solution
  1. V = L × W × T = 10 ft × 10 ft × 0.333 ft = 33.333 cu ft
  2. 33.333 cu ft × (1 + 10 %) = 36.667 cu ft
  3. 36.667 cu ft ÷ 0.6 cu ft (80 lb) = 61.11

Ordering concrete is a one-shot job: run short in the middle of a pour and you get a weak cold joint; order far too much and you pay for a truck of waste. This concrete calculator gives you the volume to plan for, in cubic yards, cubic feet, cubic metres or litres, and translates it into materials.

It covers the three shapes that make up most small projects: slabs, footings and walls (any rectangular block), round columns and tubes such as fence posts or Sonotube piers, and solid stairs with an optional landing. Enter the number of identical pieces and a waste margin, and the calculator gives the total to order.

Then choose how the concrete will be made. With premixed bags you get the number of 40, 60 or 80 lb bags (or 25 and 35 kg bags). With site-mixed concrete, common in Morocco, France and much of the world, you get the cement in kilograms and in 50 kg bags, plus sand, gravel and water for the dosage you select. To find the area of an irregular slab first, use the square footage calculator.

How to use this calculator

  1. Pick the element: slab/footing/wall, round column/tube, or stairs.
  2. Enter the dimensions. Each field has its own unit, so you can type a slab in feet with a thickness in inches, or in metres and centimetres.
  3. For a tube, add the inner diameter; for stairs, enter width, rise, run, number of steps and an optional landing.
  4. Set the number of identical pieces and the waste margin (10% by default).
  5. Choose premixed bags and a bag size, or site-mixed with a cement dosage and bag size.
  6. Read the volume to order and the material quantities. Open the steps to see each calculation.

The formula

The volume of one piece depends on its shape:

Vslab=L×W×TV_{slab} = L \times W \times T
Vcolumn=π4 (D2−d2) HV_{column} = \frac{\pi}{4}\,(D^2 - d^2)\,H

where dd is the inner diameter of a tube (0 for a solid column). Solid stairs are treated as a stack of blocks: step ii is run×W×i⋅rise\text{run} \times W \times i \cdot \text{rise}, which sums to

Vstairs=W[run⋅rise⋅n(n+1)2+landing⋅rise⋅n]V_{stairs} = W \left[\text{run} \cdot \text{rise} \cdot \frac{n(n+1)}{2} + \text{landing} \cdot \text{rise} \cdot n\right]

The total to order is V×pieces×(1+waste/100)V \times \text{pieces} \times (1 + \text{waste}/100). One cubic yard is 27 cu ft, about 0.7646 m³.

Premixed bags divide that total by the bag yield: about 0.30, 0.45 and 0.60 cu ft for 40, 60 and 80 lb bags, the figures printed by major US brands. Metric bags use the same yield per kilogram, roughly 11.7 L for 25 kg and 16.4 L for 35 kg.

Site-mixed quantities use widely published indicative proportions per m³: the cement dosage you select (250 to 400 kg), about 0.4 m³ of sand, 0.8 m³ of gravel and water close to half the cement weight (a water/cement ratio of about 0.5).

Worked example

You are pouring a 10 ft × 10 ft patio, 4 in thick, with 10% extra.

  • Net volume: 10×10×412=33.3310 \times 10 \times \tfrac{4}{12} = 33.33 cu ft, or 33.33/27=1.2333.33 / 27 = 1.23 cu yd
  • With waste: 33.33×1.10=36.6733.33 \times 1.10 = 36.67 cu ft, about 1.36 cu yd (1.038 m³)
  • With 80 lb bags at 0.60 cu ft each: 36.67/0.60=61.136.67 / 0.60 = 61.1, so buy 62 bags

For that much concrete, a small ready-mix delivery or a rented mixer is often easier than 62 bags.

In metric: a 4 m × 3 m slab 12 cm thick is 1.441.44 m³, or 1.584 m³ with 10% extra. Site-mixed at 350 kg/m³, that is about 554 kg of cement (12 bags of 50 kg), 0.63 m³ of sand, 1.27 m³ of gravel and roughly 277 L of water.

Choosing a cement dosage

Dosage Typical use
250 kg/m³ Blinding layer under footings, non-structural fill
300 kg/m³ Unreinforced footings, garden paths, fence post bases
350 kg/m³ Reinforced concrete: slabs, beams, columns, lintels
400 kg/m³ High-strength or watertight work: tanks, pools, exposed elements

These are rules of thumb, not a mix design. Real proportions depend on the cement class, the moisture and grading of your aggregates and the strength you need. For anything load-bearing (a floor slab, columns, a retaining wall) follow the drawings and specification of a qualified engineer.

Tips for a successful pour

  • Check the formwork depth in several places: a slab that is 1 cm or ½ inch thicker than planned adds more concrete than you might think.
  • Add more margin for uneven sub-base, hand mixing or pumping, where losses are higher.
  • Keep the water down. Extra water makes mixing easier but weakens the concrete and increases cracking.
  • Cure it. Keep fresh concrete damp for at least a week, especially in hot or windy weather.

Frequently asked questions

How many 80 lb bags of concrete make a cubic yard?

A cubic yard is 27 cu ft and an 80 lb bag yields about 0.60 cu ft, so you need 45 bags, before any waste. With 60 lb bags it is 60 bags, and with 40 lb bags 90.

How many 50 kg bags of cement are in 1 m³ of concrete?

At the common 350 kg/m³ dosage, 1 m³ needs 350 kg of cement, which is 7 bags of 50 kg. At 300 kg/m³ it is 6 bags, and at 400 kg/m³ 8 bags.

How thick should a concrete slab be?

Walkways and patios are often 4 in (10 cm) thick, while driveways and garage floors are usually 5 to 6 in (12 to 15 cm). Local codes and soil conditions can require more, so check before you pour.

How do I calculate concrete for stairs?

Treat each step as a block resting on the ground: its height is the rise times the step number. Adding them gives width × run × rise × n(n+1)/2. Choose Stairs and enter the width, rise, run and number of steps.

Should I use bags or ready-mix concrete?

Bags suit small jobs up to about one cubic metre (1.3 cu yd). Beyond that, a ready-mix truck or a mixer with bulk sand, gravel and cement is usually cheaper, faster and gives a more uniform result.