Editors, colourists, subtitlers and VFX artists constantly juggle two ways of describing the same moment in a video: a frame count (frame 86 400) and a timecode label (01:00:00:00). This converter switches between the two at every common frame rate, including the awkward NTSC-derived ones.
Choose a mode: turn a number of frames into timecode, turn a timecode into frames and real elapsed time, convert a real duration in seconds into the nearest timecode, or add and subtract timecodes to work out the length of a shot, an edit or a programme.
At 29.97 and 59.94 fps the converter handles drop-frame timecode, the counting scheme that keeps broadcast timecode in step with the wall clock. It rejects labels that cannot exist in drop-frame (such as 00:01:00;00) and shows how far a non-drop timecode drifts from real time.
How to use this calculator
- Pick what you want to convert: frames, a timecode, a real duration, or a sum of two timecodes.
- Choose the frame rate of your project. Check it in your editing software’s sequence settings: 25 fps is standard in Europe and North Africa, 23.976 or 24 for film and streaming, 29.97 for North American broadcast.
- At 29.97 or 59.94, switch drop-frame on or off to match the project. Drop-frame timecodes are written with a semicolon before the frames.
- Enter the frames, seconds or timecode(s). Timecodes are typed as HH:MM:SS:FF; you can also paste eight digits (01000000).
- Read the timecode or frame count, the real elapsed time and, for fractional rates, the gap between the label and the clock.
The formula
For a timecode at a nominal rate (24, 25, 30, 50 or 60 frames counted per second), the non-drop frame number is
Drop-frame (SMPTE ST 12-1) skips frame numbers at the start of every minute except minutes 0, 10, 20, 30, 40 and 50, with at 29.97 fps and at 59.94 fps. With total minutes:
Real elapsed time divides the frame count by the true rate: 24, 25, 30… or, for the NTSC family, (so 29.97 is exactly ).
Worked example
One hour of 29.97 drop-frame. The label 01:00:00;00 is 60 minutes, of which 54 are not multiples of ten, so frames. Divided by , that is 3,599.9964 s, within 4 ms of a real hour.
The same hour without drop-frame is 108,000 frames, which really lasts 3,603.6 s: the label falls 3.6 s behind the clock every hour.
A dropped label. At 29.97 DF, frame 1 800 is not 00:01:00;00 but 00:01:00;02: numbers ;00 and ;01 are skipped at the start of minute 1.
PAL. At 25 fps, 1 500 frames are exactly 00:01:00:00, one minute.
Why drop-frame exists
When colour was added to American television in 1953, the field rate was lowered from 60 to about 59.94 Hz to avoid interference with the sound carrier. Video at "30" fps really runs at 29.97 fps, so a counter that labels 30 frames per second slowly falls behind: 108 frames, or 3.6 seconds, every hour. Broadcasters need programme lengths to match the clock, so SMPTE defined drop-frame counting: the frame numbers 00 and 01 are skipped every minute, except every tenth minute. Over ten minutes that removes 18 labels, which is exactly the shortfall. No pictures are discarded; only the numbering changes.
At 59.94 fps the same correction needs four numbers per minute (00 to 03). At 23.976 fps there is no drop-frame scheme: timecode simply counts 24 labels per second and drifts from real time, which is why film workflows usually reason in frames or feet rather than clock time.
Frame rates at a glance
| Rate | Typical use | Drop-frame |
|---|---|---|
| 23.976 | Film shot for NTSC video, streaming series | No |
| 24 | Cinema, digital cinema packages | No |
| 25 | European, African and Asian PAL broadcast | No |
| 29.97 | North American and Japanese broadcast | Optional (usually yes) |
| 30 | Web video, some cameras | No |
| 50 | European HD broadcast, sport | No |
| 59.94 | North American HD broadcast, sport | Optional |
| 60 | Gaming capture, web | No |
Adding timecodes
Timecode cannot be added digit by digit because frames roll over at 24, 25 or 30 and drop-frame skips labels. The reliable method, used here, is to convert both timecodes to frame counts, add or subtract the integers, then convert back. Subtracting the timecode in from the timecode out gives a clip’s duration; remember to add one frame if your editor counts the out point inclusively.
Frequently asked questions
How do I convert frames to timecode?
Divide the frame count by the nominal rate: the remainder is the frame field, and the quotient is the number of timecode seconds, which you split into hours, minutes and seconds. In drop-frame, first add back the skipped numbers (2 per minute at 29.97, except every tenth minute). The converter does all of this for you.
Is 29.97 drop-frame timecode the same as real time?
Almost. One hour of drop-frame timecode is 107 892 frames, which lasts 3 599.9964 seconds, about 3.6 ms short of an hour. The tiny residue is corrected over 24 hours in practice by resynchronising to the house clock.
Why is 00:01:00;00 rejected?
In drop-frame, the labels ;00 and ;01 do not exist at the start of minutes that are not multiples of ten. The frame after 00:00:59;29 is 00:01:00;02.
Should I use drop-frame or non-drop-frame?
Use drop-frame for 29.97 or 59.94 material whose duration must match the clock, such as broadcast programmes and commercials. Non-drop is simpler for editing and visual effects work where only frame counts matter. Never mix the two in one project.
What is the difference between 23.976 and 24 fps timecode?
The labels are identical (24 frames per timecode second), but 23.976 material plays 0.1% slower, so one hour of 23.976 timecode lasts 3 603.6 real seconds.
Sources
- SMPTE ST 12-1:2014, Time and Control Code
- ITU-R BT.1700, Characteristics of composite video signals (NTSC 30000/1001 rate)
- EBU Tech 3097, Time-and-control code for television recording
Last updated: